Are you planning to replace your hardwood floors? If yes, you will realize that replacement requires lots of planning. While planning, you will probably want to know how long it will take you to replace hardwood floors.

You don’t want to wait around for several weeks without being able to use your home properly. However, you should note that there are many  factors involved in determining the duration of replacing hardwood floors.

Basically, it will take around 1 – 3 days to install the floor depending on its size. However, due to the need for hardwood acclimation and other things, you will need about 8 – 10 days to complete the whole process.

A typical timeline for replacing hardwood floors

Replacing hardwood flooring usually involves some basic steps. So, let’s take a look at each step and how long it will take.

Step 1: Removal of old hardwood floor

As expected, you need to remove the old hardwood flooring before installing a new one. Unless the space is large, this should be completed in a few hours by a professional hardwood floor installer.

Step 2: Acclimation

To ensure that the hardwood floor blends with its new environment, there is a need for acclimation. At this stage, the installer will bring the new flooring items into your home and allow them to breathe. With proper acclimation, hardwood floor replacement will be a walk in the park.

The hardwood flooring materials should be allowed to acclimate for some days. Although you may want to rush things, failure to acclimate can jeopardize the whole flooring replacement. So, make sure the acclimation lasts for about 7 or more days.

Step 3: Installation of new flooring

Once the process of acclimation is complete, the hardwood flooring contractor will prepare the subflooring. This process can also add a few hours or days to the time it will take to replace your hardwood flooring.

Afterwards, the contractor will  install a new hardwood floor. The number of hardwood flooring installers and the size of the room are the major factors that will determine the duration of the installation. While an experienced installer will need about 2 days to install hardwood floors in a room of 750 to 1,000 square feet, a team of two installers will need only one day. Additionally, the presence of fireplaces, cabinets, and other obstacles in the job site can extend the timeline for replacing hardwood flooring. Therefore, you must get rid of obstacles that can affect the works of the installers.